Phase 1

  • A new storm sewer and outfall on Crerar Boulevard from Crescent Drive to Lake Ontario, alleviating capacity pressure from the existing storm sewer outfall
  • Installation is being coordinated with Utilities Kingston as part of the sanitary forcemain replacement and sewer pumping station upgrades. Learn more on the Utilities Kingston project page.
  • Relining of the existing storm sewer outfall through Crerar Park for increased service life.
  • Select culvert replacement and upsizing on the lower portion of Montgomery Boulevard.
  • Restoration and reinstatement of disturbed boulevards and medians.
  • Full asphalt resurfacing of Crerar Boulevard from Lakeshore Boulevard to Cresent Drive.

Phase 2

  • A new storm system connection between the existing box culvert crossing Front Road, and the existing storm sewer on Lakeshore Boulevard. This connection will improve the existing systems' overall hydraulic capacity and reduce ponding.
  • A new large diameter storm sewer bypass system on Lakeshore Boulevard from Front Road to the existing outfall, designed to capture upstream ponding during large storm events and release it safely near the outfall, reducing historic issues with water flowing overland and flooding backyards.

Construction impacts

Traffic disruptions are expected, with potential for road closures with local access only. Stay informed on any city road closures and find alternative routes.

Stay informed

Updates on project progress, construction impacts, and timelines will be shared on this page. Use the Follow Project feature to receive updates by email.

Upgrades are planned in the Reddendale area to improve stormwater capacity, reduce ponding and flooding and extend existing infrastructure life. Additional drainage improvements on Lakeshore Boulevard will help reduce ponding and flooding.

Project location map

Project map

Planned improvements

Phase 1

  • A new storm sewer and outfall on Crerar Boulevard from Crescent Drive to Lake Ontario, alleviating capacity pressure from the existing storm sewer outfall
  • Installation is being coordinated with Utilities Kingston as part of the sanitary forcemain replacement and sewer pumping station upgrades. Learn more on the Utilities Kingston project page.
  • Relining of the existing storm sewer outfall through Crerar Park for increased service life.
  • Select culvert replacement and upsizing on the lower portion of Montgomery Boulevard.
  • Restoration and reinstatement of disturbed boulevards and medians.
  • Full asphalt resurfacing of Crerar Boulevard from Lakeshore Boulevard to Cresent Drive.

Phase 2

  • A new storm system connection between the existing box culvert crossing Front Road, and the existing storm sewer on Lakeshore Boulevard. This connection will improve the existing systems' overall hydraulic capacity and reduce ponding.
  • A new large diameter storm sewer bypass system on Lakeshore Boulevard from Front Road to the existing outfall, designed to capture upstream ponding during large storm events and release it safely near the outfall, reducing historic issues with water flowing overland and flooding backyards.

Construction impacts

Traffic disruptions are expected, with potential for road closures with local access only. Stay informed on any city road closures and find alternative routes.

Stay informed

Updates on project progress, construction impacts, and timelines will be shared on this page. Use the Follow Project feature to receive updates by email.

  • Project update - Sept. 25, 2026

    Construction is starting on the Crerar Boulevard portion of this project as of Sept. 23, 2026.

    Local traffic will be allowed access to properties. Local traffic will be permitted so residents and visitors can access nearby properties. Where safe and practical, the contractor will create temporary walkways around the construction areas for pedestrians. Please follow signs guiding you around any detours.

    For up-to-date information about road and sidewalk closures and other traffic disruptions as a result of road work, visit Municipal511.ca.

    Construction is starting on the Crerar Boulevard portion of this project as of Sept. 23, 2026.

    Local traffic will be allowed access to properties. Local traffic will be permitted so residents and visitors can access nearby properties. Where safe and practical, the contractor will create temporary walkways around the construction areas for pedestrians. Please follow signs guiding you around any detours.

    For up-to-date information about road and sidewalk closures and other traffic disruptions as a result of road work, visit Municipal511.ca.

Page last updated: 25 Sep 2026, 02:40 PM