Construction starting soon

Construction is starting soon and is expected to last for 12-15 months.

Waterside Way Park and Trails is a new park and trail system in the Pittsburgh District.

The new park will include a mid-sized playground, an open lawn/play field and pedestrian pathways with seating. The proposed trails run through an environmentally protected wooded area that buffers the subdivision from the river. They are to be natural, of modest scale and will connect to the new park. A lookout site that is to be naturalistic in design, is proposed for the water’s edge as part of the trail plan.

A design plan for the new Waterside Way Park and Trails featuring a playground to the east of the park, surrounded by a circular pathway and landscaping. Waterside Way Park and Trails - Design Plan



Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>