Roadway repairs, along with pedestrian safety and access improvements and traffic calming features are planned for Wright Crescent this summer.
The pedestrian improvements will improve accessibility and safety along Wright Crescent by improving the condition of the existing sidewalk and slowing traffic.
Planned improvements:
A reconstructed sidewalk along the inside of Wright Crescent, replacing the existing asphalt sidewalk with a concrete sidewalk
Construction of curb bulb-outs along Wright Crescent to provide traffic calming, and to delineate the areas for on-street parking.
Narrowing of Wright Crescent to further support traffic calming
Storm sewer modifications to improve roadway drainage
Watermain replacement along the north leg of Wright Crescent
Repaving the entire length of Wright Crescent
Construction of a multi-use path between Wright Crescent and Sir John A. MacDonald Boulevard.
Upgrading sidewalk para-ramps to current standards at both Wright Crescent and Palace Road intersections
Construction Impacts
Access: During construction, there will be some lane reductions. Roads may be temporarily closed during repaving or driveway access may temporarily be unavailable for short periods during construction.
Parking: On-street parking may be reduced or not available during portions of construction.
A map of the project area.
Stay informed
Project updates, including more details on construction impacts, will be shared on this page and with project followers. Use the follow project feature on this page to sign up to receive updates in your inbox.
Roadway repairs, along with pedestrian safety and access improvements and traffic calming features are planned for Wright Crescent this summer.
The pedestrian improvements will improve accessibility and safety along Wright Crescent by improving the condition of the existing sidewalk and slowing traffic.
Planned improvements:
A reconstructed sidewalk along the inside of Wright Crescent, replacing the existing asphalt sidewalk with a concrete sidewalk
Construction of curb bulb-outs along Wright Crescent to provide traffic calming, and to delineate the areas for on-street parking.
Narrowing of Wright Crescent to further support traffic calming
Storm sewer modifications to improve roadway drainage
Watermain replacement along the north leg of Wright Crescent
Repaving the entire length of Wright Crescent
Construction of a multi-use path between Wright Crescent and Sir John A. MacDonald Boulevard.
Upgrading sidewalk para-ramps to current standards at both Wright Crescent and Palace Road intersections
Construction Impacts
Access: During construction, there will be some lane reductions. Roads may be temporarily closed during repaving or driveway access may temporarily be unavailable for short periods during construction.
Parking: On-street parking may be reduced or not available during portions of construction.
A map of the project area.
Stay informed
Project updates, including more details on construction impacts, will be shared on this page and with project followers. Use the follow project feature on this page to sign up to receive updates in your inbox.
Page last updated: 07 Jul 2025, 11:08 AM
Follow Project
Stay informed
Subscribe for project updates
Project Timeline
Spring 2025 - Finalize Design
Wright Crescent Transportation Improvements is currently at this stage
The project team will finalize the design.
Summer 2025 - Construction
this is an upcoming stage for Wright Crescent Transportation Improvements
All information received will be compiled and considered by staff for use under the purposes of this site. Information will be collected and used in accordance with the Municipal Freedom of Information and Protection of Privacy Act and other relevant privacy legislation. All comments made on this site are available to the public and may form part of public records.