Garrigan Park
Public engagement is complete and we thank you for your feedback. Review the engagement summary.

We’re planning improvements at Garrigan Park in the Portsmouth District!
Planned improvements to the playground include:
- Replacing aging playground equipment
- Combining playground areas so that all play equipment is located on a single pad of safety surfacing
- Creating new bench seating and an accessible pathway
- Installing new safety surfacing
Park location
Garrigan Park is located at 196 Yonge St.

We’re planning improvements at Garrigan Park in the Portsmouth District!
Planned improvements to the playground include:
- Replacing aging playground equipment
- Combining playground areas so that all play equipment is located on a single pad of safety surfacing
- Creating new bench seating and an accessible pathway
- Installing new safety surfacing
Park location
Garrigan Park is located at 196 Yonge St.
Public engagement is complete and we thank you for your feedback. Review the engagement summary.
-
Final Design
Garrigan Park playground rendering

Garrigan Park plan

Garrigan Park playground rendering

Garrigan Park plan

Public engagement is complete and we thank you for your feedback. Review the engagement summary.
-
Garrigan Park Engagement Summary
Garrigan Park playground needs to be replaced due to the aging equipment. Consultation on the design of the playground commenced on Feb. 8, 2023, with an online public meeting and from Feb. 8 to March 2, feedback on two playground design options was collected in an online survey. Public feedback was collected from over eight respondents during the consultation period.
Feedback highlights
- Slides, swings, and monkey bars were the top favourite components from the old play equipment.
- When asked to rank the playground design preference, respondents ranked Option 1 (57%) and Option 2 (43%).
- If budget permits, many respondents wouldContinue reading
Garrigan Park playground needs to be replaced due to the aging equipment. Consultation on the design of the playground commenced on Feb. 8, 2023, with an online public meeting and from Feb. 8 to March 2, feedback on two playground design options was collected in an online survey. Public feedback was collected from over eight respondents during the consultation period.
Feedback highlights
- Slides, swings, and monkey bars were the top favourite components from the old play equipment.
- When asked to rank the playground design preference, respondents ranked Option 1 (57%) and Option 2 (43%).
- If budget permits, many respondents would like some more playground options that provide a wider age range and ability. There was some interest in the small dome climber as it provides imaginative and flexible play.
- There were several requests for an outdoor ice rink and splash pad.
- These amenities are not proposed as part of the playground improvement. Please refer to the City’s website on how to initiate a community-operated outdoor rink and the Park and Recreation Master Plan on the planned splash pad locations
Playground design options ranked during the public consultation
Option 1 included:
- Play structure with a wave slide, cable pod, 3 climbing options including monkey bars
- A swing set with one belt swing, one toddler swing, one accessible swing
Option 1 Play Structure
Option 1 Swing SetOption 2 included:
- Wave slide and 1 climbing option
- Dome climber
- A swing set with one belt swing, one toddler swing, one accessible swing
Option 2 Play Structure
Option 2 Swing SetPublic engagement is complete and we thank you for your feedback. Review the engagement summary.
Key Dates
-
February 08 2023
-
February 08 → March 02 2023
Who's Listening
-
Parks and Open Space Coordinator, Parks & Shoreline
Email csames@cityofkingston.ca
Project Timeline
-
Public engagement - Feb. 2023
Garrigan Park has finished this stageJoin us for an online engagement session to learn about the project and complete the survey to share your comments by March 2.
-
Planning and design - Winter/Spring 2023
Garrigan Park has finished this stageThe final designs will be shared online.
-
Construction
Garrigan Park is currently at this stageConstruction started in 2024.
Notice of Collection
All information received will be compiled and considered by staff for use under the purposes of this site. Information will be collected and used in accordance with the Municipal Freedom of Information and Protection of Privacy Act and other relevant privacy legislation. All comments made on this site are available to the public and may form part of public records.