Garrigan Park playground needs to be replaced due to the aging equipment. Consultation on the design of the playground commenced on Feb. 8, 2023, with an online public meeting and from Feb. 8 to March 2, feedback on two playground design options was collected in an online survey. Public feedback was collected from over eight respondents during the consultation period.

Feedback highlights

  • Slides, swings, and monkey bars were the top favourite components from the old play equipment.
  • When asked to rank the playground design preference, respondents ranked Option 1 (57%) and Option 2 (43%).
  • If budget permits, many respondents would like some more playground options that provide a wider age range and ability. There was some interest in the small dome climber as it provides imaginative and flexible play.
  • There were several requests for an outdoor ice rink and splash pad.

Playground design options ranked during the public consultation

Option 1 included:

  • Play structure with a wave slide, cable pod, 3 climbing options including monkey bars
  • A swing set with one belt swing, one toddler swing, one accessible swing

A rendering of the proposed playground equipment, including a wave slide, a rappel wall, monkey bars and a cable pod challenge.Option 1 Play Structure A swing set with one belt swing, one toddler swing and one accessible swingOption 1 Swing Set

Option 2 included:


  • Wave slide and 1 climbing option
  • Dome climber
  • A swing set with one belt swing, one toddler swing, one accessible swing
A second view of option 2 playground options including a single slide and dome climber.Option 2 Play Structure

A swing set with one belt swing, one toddler swing and one accessible swingOption 2 Swing Set


Share Garrigan Park Engagement Summary on Facebook Share Garrigan Park Engagement Summary on Twitter Share Garrigan Park Engagement Summary on Linkedin Email Garrigan Park Engagement Summary link

Public engagement is complete and we thank you for your feedback. Review the engagement summary.