Gore Road Transportation Improvements

New and improved pedestrian, cyclist, and active transportation infrastructure is planned for Gore Road between Highway 15 and the Greenwood Park Trail. Once completed, these improvements will connect the Greenwood Park neighbourhood to the City's larger active transportation network via the Waaban Crossing. Design work is ongoing in 2026 with construction to start in late 2026.

Have your say: Rest areas

We’re seeking input on where rest areas should be located along the new multi-use pathway. Feedback will help refine design details while balancing safety, accessibility, and technical requirements.

Planned improvements

  • Roadway improvements, including roadway alignment improvements and new asphalt
  • New Multi-Use Path (MUP) on the north side of Gore Road to make it easier and safer for pedestrians and cyclists to connect to the Waaban Crossing and Greenwood Park Trail network.
  • Extension of the existing sidewalk on the south side of Gore Road from Rose Abbey Drive to the Greenwood Park Trail.
  • Improved lighting for the roadway and MUP.
  • Pedestrian and bike crossing improvements.
  • Drainage improvements throughout the corridor including culvert replacements.
  • Turtle Fencing and Turtle Crossing at Butternut Creek.

Construction Impacts

  • Access: During construction, there may be lane reductions and occasional localized closures. Local access to the Greenwood Park neighbourhood will be maintained. Advanced signage will be in place to notify of upcoming impacts and detours.
Gore Rd Corridor Improvements Project Area

Stay informed

Project updates, including more details on construction impacts, will be shared on this page and with project followers. Use the follow project feature on this page to subscribe to receive updates in your inbox.

New and improved pedestrian, cyclist, and active transportation infrastructure is planned for Gore Road between Highway 15 and the Greenwood Park Trail. Once completed, these improvements will connect the Greenwood Park neighbourhood to the City's larger active transportation network via the Waaban Crossing. Design work is ongoing in 2026 with construction to start in late 2026.

Have your say: Rest areas

We’re seeking input on where rest areas should be located along the new multi-use pathway. Feedback will help refine design details while balancing safety, accessibility, and technical requirements.

Planned improvements

  • Roadway improvements, including roadway alignment improvements and new asphalt
  • New Multi-Use Path (MUP) on the north side of Gore Road to make it easier and safer for pedestrians and cyclists to connect to the Waaban Crossing and Greenwood Park Trail network.
  • Extension of the existing sidewalk on the south side of Gore Road from Rose Abbey Drive to the Greenwood Park Trail.
  • Improved lighting for the roadway and MUP.
  • Pedestrian and bike crossing improvements.
  • Drainage improvements throughout the corridor including culvert replacements.
  • Turtle Fencing and Turtle Crossing at Butternut Creek.

Construction Impacts

  • Access: During construction, there may be lane reductions and occasional localized closures. Local access to the Greenwood Park neighbourhood will be maintained. Advanced signage will be in place to notify of upcoming impacts and detours.
Gore Rd Corridor Improvements Project Area

Stay informed

Project updates, including more details on construction impacts, will be shared on this page and with project followers. Use the follow project feature on this page to subscribe to receive updates in your inbox.

  • Proposed project design and renderings

    Review the following images of the project design, including proposed rest stops (below in red).

    To view the full map layout in PDF format, click here.

    Gore Road rendering Fieldstone Drive and Rose Abbey DriveHighway 15 to Firehall entrance





    Firehall entrance to Maclean ParkFirehall entrance to Maclean Park





    Maclean Park towards Donald Steet/Grenadier AveMaclean Park towards Donald Steet/Grenadier Ave





    Donald Steet/Grenadier Ave towards Rose Abbey DriveDonald Steet/Grenadier Ave towards Rose Abbey Drive






    Rose Abbey Drive towards Fieldstone DriveRose Abbey Drive towards Fieldstone Drive





    Rose Abbey Drive towards Fieldstone Drive (continued)Rose Abbey Drive towards Fieldstone Drive (continued)



    Fieldstone Drive to Butternut CreekFieldstone Drive to Butternut Creek





    Gore Road rendering at Plaza entranceGore Road rendering at Plaza entrance





    Gore Road rendering at Plaza entranceGore Road rendering at Maclean Park





    Gore Road rendering Fieldstone Drive and Rose Abbey DriveGore Road rendering Fieldstone Drive and Rose Abbey Drive



    Review the following images of the project design, including proposed rest stops (below in red).

    To view the full map layout in PDF format, click here.

    Gore Road rendering Fieldstone Drive and Rose Abbey DriveHighway 15 to Firehall entrance





    Firehall entrance to Maclean ParkFirehall entrance to Maclean Park





    Maclean Park towards Donald Steet/Grenadier AveMaclean Park towards Donald Steet/Grenadier Ave





    Donald Steet/Grenadier Ave towards Rose Abbey DriveDonald Steet/Grenadier Ave towards Rose Abbey Drive






    Rose Abbey Drive towards Fieldstone DriveRose Abbey Drive towards Fieldstone Drive





    Rose Abbey Drive towards Fieldstone Drive (continued)Rose Abbey Drive towards Fieldstone Drive (continued)



    Fieldstone Drive to Butternut CreekFieldstone Drive to Butternut Creek





    Gore Road rendering at Plaza entranceGore Road rendering at Plaza entrance





    Gore Road rendering at Plaza entranceGore Road rendering at Maclean Park





    Gore Road rendering Fieldstone Drive and Rose Abbey DriveGore Road rendering Fieldstone Drive and Rose Abbey Drive