Share Construction starting soon on Facebook
Share Construction starting soon on Linkedin
Email Construction starting soon link
Construction is starting soon and is expected to last for 12-15 months.
Waterside Way Park and Trails is a new park and trail system in the Pittsburgh District.
The new park will include a mid-sized playground, an open lawn/play field and pedestrian pathways with seating. The proposed trails run through an environmentally protected wooded area that buffers the subdivision from the river. They are to be natural, of modest scale and will connect to the new park. A lookout site that is to be naturalistic in design, is proposed for the water’s edge as part of the trail plan.
Waterside Way Park and Trails - Design Plan
Share See the design options for Waterside Way Park and trails in Kingston’s east end on Facebook
Share See the design options for Waterside Way Park and trails in Kingston’s east end on Linkedin
Email See the design options for Waterside Way Park and trails in Kingston’s east end link
East-enders: Join an online engagement session at 6 p.m. on Wednesday, Oct. 27 to see the design options for Waterside Way Park and Trails.
Share Summer 2021 public engagement summary on Facebook
Share Summer 2021 public engagement summary on Linkedin
Email Summer 2021 public engagement summary link
Public feedback was collected from over 135 respondents between June 16th and July 21st from the zoom webinar and an online survey.
Share Offer input on the development of the Waterside Way Park and trail system in Kingston’s east end on Facebook
Share Offer input on the development of the Waterside Way Park and trail system in Kingston’s east end on Linkedin
Email Offer input on the development of the Waterside Way Park and trail system in Kingston’s east end link
East-enders: Join an online engagement session for an introduction to a new park and trail system being developed on Waterside Way in the Pittsburgh District overlooking the Cataraqui River.