Williamsville Transportation Study

Consultation has concluded and the engagement reports are available to read



Decorative graphic showing three different people walking on a sidewalk, a bus in the road.and a streetlight and tree on the sidewalk boulevard.

Shaping the Princess Street Corridor 

The City of Kingston is completing the second phase of a transportation study of Princess Street, from east of Bath Road and Concession Street to Division Street, known as the Williamsville Main Street area. The purpose of this study is to develop the preferred cross-section for this section of the Princess Street corridor. It continues work completed in 2020 to support the proposed planning policy amendments for the Williamsville Main Street Study.

The initial phase of the 2020 transportation study confirmed that the Williamsville corridor is capable of accommodating the additional growth and traffic projected through the Williamsville study area without mitigation. That study also identified that both existing and future growth in the Williamsville area have relatively high rates of walking, biking and transit use. Therefore, it is important to accommodate the demand for these non-passenger vehicle modes of transportation 

One major constraint identified during the first phase of the transportation study was the limited right-of-way space. It is not possible for Princess Street to simultaneously be a transit priority corridor, a cycling spine route, a pedestrian-friendly corridor, and an arterial roadway leading to the downtown core. Therefore, a second phase of the study needs to identify the role, function and cross-section for the Princess Street corridor. 

This second phase study will be used to guide and inform current and future projects along Princess Street, including a segment of Princess Street from Alfred to Division Streets, which has funding for future reconstruction. 

A map shows the extent of the Williamsville Main Street Transportation study area, which stretches along Princess Street beginning at Bath Road and Concession Street and continuing along Princess Street until Division Street. Within the study area, a reconstruction area is shown between Alfred Street and Division Street along Princess Street. Two future westbound transit priority lanes are also shown along Princess Street, one between Drayton Avenue and MacDonnell Street and the other between Albert Street and Frontenac Street. A pin shows the location of a proposed signalization of the intersection of Princess Street and Drayton Avenue and a future transit queue jump located there. Another pin shows a proposed introduction of a left turn lane at Nelson Street and Princess Street to compensate for the removal of left turn lanes at Albert Streets. A third pin shows a future transit queue jump at the intersection of Albert Street and Princess Street.

More on Williamsville transportation



Decorative graphic showing three different people walking on a sidewalk, a bus in the road.and a streetlight and tree on the sidewalk boulevard.

Shaping the Princess Street Corridor 

The City of Kingston is completing the second phase of a transportation study of Princess Street, from east of Bath Road and Concession Street to Division Street, known as the Williamsville Main Street area. The purpose of this study is to develop the preferred cross-section for this section of the Princess Street corridor. It continues work completed in 2020 to support the proposed planning policy amendments for the Williamsville Main Street Study.

The initial phase of the 2020 transportation study confirmed that the Williamsville corridor is capable of accommodating the additional growth and traffic projected through the Williamsville study area without mitigation. That study also identified that both existing and future growth in the Williamsville area have relatively high rates of walking, biking and transit use. Therefore, it is important to accommodate the demand for these non-passenger vehicle modes of transportation 

One major constraint identified during the first phase of the transportation study was the limited right-of-way space. It is not possible for Princess Street to simultaneously be a transit priority corridor, a cycling spine route, a pedestrian-friendly corridor, and an arterial roadway leading to the downtown core. Therefore, a second phase of the study needs to identify the role, function and cross-section for the Princess Street corridor. 

This second phase study will be used to guide and inform current and future projects along Princess Street, including a segment of Princess Street from Alfred to Division Streets, which has funding for future reconstruction. 

A map shows the extent of the Williamsville Main Street Transportation study area, which stretches along Princess Street beginning at Bath Road and Concession Street and continuing along Princess Street until Division Street. Within the study area, a reconstruction area is shown between Alfred Street and Division Street along Princess Street. Two future westbound transit priority lanes are also shown along Princess Street, one between Drayton Avenue and MacDonnell Street and the other between Albert Street and Frontenac Street. A pin shows the location of a proposed signalization of the intersection of Princess Street and Drayton Avenue and a future transit queue jump located there. Another pin shows a proposed introduction of a left turn lane at Nelson Street and Princess Street to compensate for the removal of left turn lanes at Albert Streets. A third pin shows a future transit queue jump at the intersection of Albert Street and Princess Street.

More on Williamsville transportation

  • CLOSED: This survey has concluded.

    On Oct. 26 an in-person open house was held. A survey at the open house asked for feedback regarding transportation options and Princess Street in Williamsville. This is a digital version of that survey.

    Survey closes Nov. 17 at 4 p.m.

    There are contains 12 questions in two parts. After question six tap or click on save and continue to move onto the second portion.

    Estimated time to complete is five minutes.

    Consultation has concluded and the engagement reports are available to read