Skip to content

Final design concepts with extended pathway

In April 2022, Council approved a project scope change to enhance the design and extend the Confederation Basin Promenade to the lighthouse. The proposed budget was increased to $9M and is included in the City’s 2023 capital budget for consideration. 

As project planning advances, two design solutions for the outer leg of the promenade are being pursued: a concrete deck and an elevated walkway. The elevated walkway would include a timber deck and railings. Both options include a lookout at the lighthouse, seating and lighting. The final configuration would be confirmed prior to construction. 

Please complete this survey to share your comments on the proposed design solutions. You may complete the survey online, or by phone or mail-back paper copy of the survey by calling 613-546-0000.

Before beginning the survey, we recommend you review the conceptual design panels online or in Battery Park, and review the public engagement summary from the third public engagement in January 2022.  

  • Time to complete: 5 minutes 
  • Survey closes Jan. 31, 2023 at 4 p.m.