Sidewalk Construction 2019
Consultation has concluded
In 2019, the City is installing 1.1 kilometres of new sidewalk in along:
- Bath Road from Coverdale east to existing sidewalk.
- Birchwood Drive from Peachwood to Cataraqui Woods Drive.
- Taylor Kidd Boulevard from Waterloo to Princess.
These locations have been chosen to fill in gaps and complete the sidewalk network as identified in the Active Transportation Master Plan.
In June 2018 City Council approved the Kingston's Active Transportation Master Plan to develop a comprehensive active transportation network supported by policies, program and facilities designed to increase active – human-powered – travel options and improve accessibility in Kingston.
You may also like to identify rest areas on the Kingscourt multi-use pathway.
Taylor Kidd
Tell
us where potential benches could be placed along the new
sidewalks to be installed at Taylor Kidd Blvd West of Princess. Closes Feb. 18 at 4 p.m.
Bath Road
Tell
us where potential benches could be placed along the new
sidewalks to be installed at Bath Road east of Coverdale. Closes Feb. 18 at 4 p.m.
Birchwood Dr
Tell
us where potential benches could be placed along the new
sidewalks to be installed at Birchwood Dr south of Peachwood. Closes Feb. 18 at 4 p.m.