Skip to content

Survey

Survey Closes May 3 at 11:55 p.m.

The City of Kingston is undergoing a Transit Service Review and needs your input! We’ve proposed ideas to shape the City’s transit network and are looking for your feedback.

This is the second round of engagement conducted as part of the transit service review after the first round of engagement was conducted in the fall of 2025. Based on the first round of engagement along with technical data, including ridership data, draft service guidelines were created during the winter of 2026. Together these inputs have led to the development of the draft system network. 

The existing network, proposed system and proposed on-peak frequency mapping are shown below.

Existing NetworkA map showing the current Kingston Transit Route System

Proposed NetworkA map showing a proposed network for Kingston Transit.

On-Peak Frequency Map

We want to hear from you!  Please take a moment to fill out the survey. Whether you use transit, drive a vehicle, or walk, we want to know what you think! Your responses will help us understand your thoughts on proposed short- and long-term changes to the Kingston Transit network. 

If you are already signed in, please refresh this page